翻訳と辞書
Words near each other
・ Aberdeen Airport (disambiguation)
・ Aberdeen Alternative Festival
・ Aberdeen and Asheboro Railroad
・ Aberdeen and Briar Patch Railway
・ Aberdeen and Kincardine Central (UK Parliament constituency)
・ Aberdeen and Kincardine East (UK Parliament constituency)
・ Aberdeen and NE Scotland Music Festival
・ Aberdeen and Rockfish Railroad
・ Aberdeen Aquatics Centre
・ Aberdeen Arsenal
・ Aberdeen Art Gallery
・ Aberdeen Asset Management
・ Aberdeen Avenue
・ Aberdeen Bach Choir
・ Aberdeen Baptist Lui Ming Choi College
Aberdeen Bay Wind Farm
・ Aberdeen Beach and Queens Links
・ Aberdeen Bestiary
・ Aberdeen Black Cats
・ Aberdeen Breviary
・ Aberdeen Brunei Senior Masters
・ Aberdeen Burghs (UK Parliament constituency)
・ Aberdeen by-election, 1872
・ Aberdeen Castle
・ Aberdeen Cathedral
・ Aberdeen Central
・ Aberdeen Central (Scottish Parliament constituency)
・ Aberdeen Central (UK Parliament constituency)
・ Aberdeen Centre
・ Aberdeen Channel


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Aberdeen Bay Wind Farm : ウィキペディア英語版
Aberdeen Bay Wind Farm

Aberdeen Bay Wind Farm is a proposed offshore wind farm to be located around 3 kilometres off the east coast of Aberdeenshire, in the North Sea, Scotland. It is being developed by the European Offshore Wind Deployment Centre consortium. The scheme consists of 11 wind turbines with an installed capacity of up to 100 megawatts.〔 It is to be located between Blackdog and Bridge of Don near Aberdeen.〔
==Planning==
The wind farm was initially proposed by the Aberdeen Renewable Energy Group (AREG) in 2003. The original plan was for 20 two-megawatt turbines in an eight kilometres long row about 1 kilometre offshore.〔 A geological survey of Aberdeen Bay was begun in 2007, and a grant of 40 million euros was offered by the European Commission in 2009. The proposal at that stage was for a maximum of 23 turbines.〔
A planning application was lodged in August 2011. The application was submitted by Aberdeen Renewable Energy Group (AREG) in cooperation with two other companies, Vattenfall and Technip.〔 The proposal was for 11 turbines.〔 Planning consent was granted by the Scottish government in March 2013.
In May 2013 Vattenfall announced plans to reduce its stake in the project. In October 2013 Aberdeenshire councillors rejected a planning application to build an electricity substation. In December 2013 it was announced that construction would be delayed for two years, with connection of the grid occurring in 2017. In January 2014 an appeal against the substation vote was lodged. The developers won the appeal in July 2014.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Aberdeen Bay Wind Farm」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.